
Irrigation Works
by E. S. Bellasis
★★★★★No ratings yet
Language: English
Sign in to rate this book.
Sign in to shelve this book.
About this eBook
- Author
- Bellasis, E. S. (Edward Skelton), 1855-1945
- Title
- Irrigation works : the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvements
- Credits
- Produced by Chris Curnow, Harry Lame and the Online Distributed Proofreading Team at www.pgdp.net (This file was produced from images generously made available by The Internet Archive)
- Language
- English
- LoC Class
- TC: Technology: Ocean engineering
- Subject
- Irrigation
- Category
- Text
- Project Gutenberg
- eBook-No. 56113
- Release Date
- December 3, 2017
- Copyright
- Public domain in the USA.
Contents
- 1.IRRIGATION WORKS
- 2.CONTENTS
- 3.PREFACE
- 4.CHAPTER I. INTRODUCTION — 1. Preliminary Remarks. — 2. General Principles of Canal Design. — 3. Information Concerning Canals. — 4. Losses of Water. — 5. Duty of Water. — 6. Sketch of a Project.
- 5.CHAPTER II. The Designing of a Canal. — 1. Headworks. — 2. The Contour Map. — 3. Alignments and Discharges. — 4. Remarks on Distributaries. — 5. Design of Canal and Branches. — 6. Banks and Roads. — 7. Trial Lines. — 8. Final Line and Estimate. — 9. Design of a Distributary. — 10. Best System of Distributaries. — 11. Outlets. — 12. Masonry Works. — 13. Pitching. — 14. Miscellaneous Items.
- 6.CHAPTER III. The Working of a Canal. — 1. Preliminary Remarks. — 2. Gauges and Regulation. — 3. Gauge Readings and Discharges. — 4. Registers of Irrigation and Outlets. — 5. Distribution of Supply. — 6. Extensions and Remodellings. — 7. Remodelling of outlets. — 8. Miscellaneous Items.
- 7.CHAPTER IV. The Punjab Triple Canal Project. [41] — 1. General Description. — 2. Areas and Discharges. — 3. Remarks.
- 8.CHAPTER V. Proposed Improvements in Irrigation Canals. — 1. Preliminary Remarks. — 2. Reduction of Losses in the Channels. — I. Ordinary Unlined Trenches. — II. Lined Trenches. — 3. Modules.
- 9.APPENDICES. — APPENDIX A. DIVIDE WALL ON LOWER CHENAB CANAL. — APPENDIX B. SPECIFICATION FOR MAINTENANCE OF CHANNELS. — I. Roads and Banks. — II. Jungle and Trees. — III. Cattle Crossings or Gháts. — IV. Miscellaneous Items. — APPENDIX C. SPECIFICATION FOR MAINTENANCE OF MASONRY WORKS. — 1. General Repairs. — 2. Jungle. — 3. Dressing, etc. — APPENDIX D. WATCHING AND PROTECTING BANKS AND EMBANKMENTS. [61] — 1. Watching. — 2. Gauge Readers, Regulating Establishment, Bungalow Watchmen, etc. — 3. Employment of Men on Repairs. — 4. Strength of Establishment. — 5. Stakes and Mallets. — 6. Breaches. — 7. Serious Breaches. — 8. Breach Reports. — 9. Progress Report. — 10. Estimates. — 11. Breaches in the Flooded Area near Canal Heads. — 12. Breaches in Flood Embankments. — APPENDIX E. SPECIFICATION FOR BUSHING. — APPENDIX F. ESCAPES. — APPENDIX G. GAUGES. — APPENDIX H. GIBB’S MODULE. [65] — Hydraulic Principle. — Structural Details. — APPENDIX K. KENNEDY’S GAUGE OUTLET. [66]
- 10.INDEX.
- 11.Transcriber’s Notes
Community reviews
Sign in to write a review.
No reviews yet.