
Hardware, Estimating, and Mill Design
by William S. Lowndes
★★★★★No ratings yet
Language: English
Sign in to rate this book.
Sign in to shelve this book.
About this eBook
- Editor
- Lowndes, William S. (William Shepherd), 1866-
- Title
- Hardware, estimating, and mill design
- Original Publication
- Scranton, PA: International Textbook Company, 1807-1909.
- Credits
- Juliet Sutherland and the Online Distributed Proofreading Team at www.pgdp.net
- Language
- English
- LoC Class
- TS: Technology: Manufactures
- Subject
- Factories -- Design and construction
- Category
- Text
- Project Gutenberg
- eBook-No. 72897
- Release Date
- February 8, 2024
- Copyright
- Public domain in the USA.
Contents
- 1.Hardware, Estimating, and Mill Design
- 2.PREFACE
- 3.CONTENTS
- 4.BUILDERS’ HARDWARE — STAPLE HARDWARE — CUT AND WIRE NAILS — WOOD SCREWS, EXPANSION AND SPECIAL BOLTS — SASH WEIGHTS — FINISHING HARDWARE — METALS AND THEIR MANIPULATION — HINGES, HINGE BUTTS, AND SPECIAL HINGES — LOCKS AND THEIR APPURTENANCES
- 5.WINDOW SASH HARDWARE — SASH TRIM FOR DOUBLE-HUNG WINDOWS — TRIMMINGS FOR PIVOTED AND CASEMENT SASH
- 6.DOOR HARDWARE AND ITS APPLICATION — SHUTTER HARDWARE — CABINET TRIM — DESIGN AND SPECIFICATION OF HARDWARE FOR BUILDINGS — HARDWARE OF SPECIAL DESIGN — HARDWARE SPECIFICATIONS — SELECTION, ESTIMATION, AND APPLICATION OF HARDWARE — SCHEDULES AND DRAWINGS FOR THE HARDWARE CONTRACTOR — GLASS AND GLAZING
- 7.ESTIMATING AND CALCULATING QUANTITIES (PART 1) — INTRODUCTION
- 8.APPROXIMATE ESTIMATING — ACCURATE ESTIMATING SCHEDULE — EXCAVATION — ACTUAL COST OF EXCAVATION — CONTRACTOR’S METHOD OF FIGURING EXCAVATION — DITCH WORK — CALCULATING THE VOLUME OF AN EXCAVATION — CONCRETE WORK — DATA ON REINFORCED-CONCRETE BUILDING — CEMENT CELLAR FLOORS — CONCRETE BUILDING BLOCKS — MASONRY — DATA ON RUBBLE MASONRY — DATA ON FLAGSTONES AND CURBING — DATA ON ASHLAR AND CUT STONE — ADDITIONAL METHOD OF ESTIMATING ASHLAR — BRICKWORK — DATA ON BRICKWORK — ESTIMATING BRICKWORK — TERRA-COTTA WORK — TILING — MACKITE — CARPENTRY — ROOFING — ROOF MENSURATION — PLASTERING — LATHING — JOINERY — JOINERY DATA AND EXAMPLES OF ESTIMATING COSTS — STRUCTURAL STEEL — HEATING AND VENTILATING SYSTEM — PLUMBING AND GAS-FITTING — PLUMBING — GAS-FITTING — PAINTING AND PAPERING — PAINTING — DATA ON PAINTING — PAPERING — GLAZING
- 9.ESTIMATING AND CALCULATING QUANTITIES (PART 2) — EXAMPLE IN ESTIMATING — EXCAVATION — Cellar Excavation — Excavation for Wall Footings [4] — Miscellaneous Excavations [5] — Filling — STONEWORK — Rubble Masonry — Ashlar [9] — Cut Stone — Concrete Footings and Floor — BRICKWORK — Pressed Brick — Common Brick — CARPENTRY — Floor Framing, First Story — Floor Framing, Second Story — Floor Framing, Attic — Floor Framing, Front Porch — Floor Framing, Back Porches — Bridging — Main-Roof Framing [11] — Porch-Roof Framing — Wall Studding — Partition Studding — Miscellaneous — Sheathing — Shingles — Flooring — ROOFING — Slating — Miscellaneous Items [16] — LATHING AND PLASTERING — Three-Coat Work — Two-Coat Work — Cornices — JOINERY — Door Frames, First Floor — Door Frames, Second Floor — Door Frames, Attic — Doors, First Story [17] — Doors, Second Floor — Doors, Attic — Window Frames, Cellar — Window Frames, First Story — Window Frames, Second Story — Window Frames, Attic — Window Sash, Cellar — Window Sash, First Story — Window Sash, Second Story — Window Sash, Attic — Screen Frames for Porch — Cellar Stairs — Back Stairs — Main Stairs — Miscellaneous Interior Joinery — Miscellaneous Exterior Work — HARDWARE — Locks — Hinges — Miscellaneous Hardware — HEATING AND VENTILATING SYSTEM — Furnace — Warm-Air and Smoke Pipes — Registers — Tin Register Boxes — Miscellaneous — PLUMBING — Fixtures — Water Supply — Drainage — GAS-FITTING — Fixtures — Pipe and Fittings — WIRING — PAINTING — Exterior Work — Interior Work — Summary of Cost of Building
- 10.MILL DESIGN — SITE AND ARRANGEMENT PRELIMINARY CONSIDERATIONS — INTRODUCTION — CLASSIFICATION OF FACTORY BUILDINGS — FACTORY PLANNING — ARRANGEMENT OF STAIR TOWERS — ELEVATOR SHAFTS — TOILET ROOMS — TYPES OF MILL CONSTRUCTION GIRDER AND PLANK-ON-EDGE CONSTRUCTION — STANDARD SLOW-BURNING CONSTRUCTION — FACTORY BUILDINGS OF REINFORCED CONCRETE — STEEL-FRAME MILL BUILDINGS
- 11.DETAILS OF MILL CONSTRUCTION AND DESIGN — BEAM CONNECTION TO GIRDERS — TRAVELING-CRANE LOADS
- 12.THE POWER PLANT
- 13.CHIMNEYS
- 14.FIRE-PROTECTION OF MILL BUILDINGS
- 15.INDEX
- 16.Untitled
Community reviews
Sign in to write a review.
No reviews yet.